Skip to main content
Skip table of contents

Rework Work Order

  1. Create a Work Order

    • When a returned item requires extra raw materials for repair, manually create a Work Order.

    • Use the returned item as both the component and output item.

  2. Add Components and Routing

    • Enter any additional components and define Routing on the Work Line, or directly in the Production Journal for posting.

  3. Item Tracking

    • The returned item can be serialized or lot-tracked to maintain traceability.

  4. Posting and Completion

    • After posting the Production Journal and completing the Work Order, GoldFinch will automatically update the returned item with the additional component and labor costs.

  5. Serial/Lot Tracing

    • Serial number and lot tracing will continue seamlessly, ensuring full traceability of the returned item.

JavaScript errors detected

Please note, these errors can depend on your browser setup.

If this problem persists, please contact our support.