Skip to main content
Skip table of contents

Phantom BOMs

Overview

To set up the Phantom BOM feature in GoldFinch, follow these stepss:

  • All Phantom BOM items must be a service item.

  • Item Formula for the Phantom BOM Items should be set up.

  • Add Phantom BOM items to the parent’s Item Formula as components.

  • To differentiate Phantom BOMs from other service items, add “Phantom BOM” as part of the Item Description.

When creating a Work Order for the parent item, GoldFinch will automatically replace the Phantom BOM component with its underlying Item Formulas.

Link to Operation No.

You can specify the Link to Operation No. for Phantom BOM’s components.

Let’s assume a Parent Item has 3 Item Routings:

Operation No.

Work Center

100

WC-A

200

WC-B

300

WC-C

and 3 Item Formulas:

Component

Link to Operation No.

A

100

Phantom BOM

200

B

300

Phantom BOM has 3 Item Formulas:

Component

Link to Operation No.

Sub-A

100

Sub-B

Sub-C

1000

When creating a Work Order, GoldFinch will automatically link the components to the routing in the following order:

Operation No.

Work Center

Component

Reason

100

WC-A

A

Sub-A

Component’s Link to Operation No. overrides Phantom BOM’s default Link to Operation No.

200

WC-B

Sub-B

Use Phantom BOM’s default Link to Operation No. because the component does not have the Link to Operation No.

Sub-C

Use Phantom BOM’s default Link to Operation No. because the Link to Operation No. for the component does not exist.

300

WC-C

B

JavaScript errors detected

Please note, these errors can depend on your browser setup.

If this problem persists, please contact our support.